For General Contractors
The sign sub that keeps your CO date.
We pull the permit, build to spec and install before your punch walk. One sub for drawings, permit, fabrication, install and electrical.
- 1-yr / 5-yr · Labor / LED warranty in writing
- Same week · Permit submitted after signing
- UL-listed · Illuminated components
- COI same day · GL, auto and workers’ comp
What you can expect
What general contractors care about. What we do about it.
Itemized bids
Fabrication, install, permit and electrical as separate lines you can level.
Permit-ready drawings
Shop drawings and permit set submitted the week we are awarded.
Schedulable lead times
Channel letters 4–8 weeks, monuments 6–12 weeks from award, including permit.
Paperwork ready
COI to your limits, W-9 and lien waivers on request.
Signs we build for you
From survey to switch-on
One crew. Four steps.
No handoffs.
You deal with one accountable team from the first measurement to the night the letters light up.
-
01
Survey
We measure the wall or site, locate power, photograph everything and review landlord criteria.
-
02
Drawings & permit
Shop drawings for your approval, then the permit is submitted the same week you sign.
-
03
Fabricate
Letters and cabinets built with UL-listed components, inspected before they leave the shop.
-
04
Install & switch on
Our crew installs, a licensed electrician connects, and you get photos the same day.
Start with a photo and an address
Got a wall that needs a sign?
Send the address and a photo of the building. We will come back with a scaled mockup, a price and a realistic permit-to-install date.
01
We review your project the same day
02
Site survey and mockup
03
Itemized quote with dates