Our process
From permit to power-on.
Permits take 2 to 6 weeks and fabrication 2 to 4. We start both clocks early and tell you the real switch-on date before you sign.
- 1-yr / 5-yr · Labor / LED warranty in writing
- Same week · Permit submitted after signing
- UL-listed · Illuminated components
- COI same day · GL, auto and workers’ comp
Week 1
Site survey
We measure the wall or site, locate power, photograph everything and pull your landlord’s sign criteria. For monuments and pylons we check setbacks, sight lines and utilities.
Week 1
Mockup and quote
A scaled mockup on a photo of your building, plus an itemized quote: fabrication, install, permit and electrical as separate lines.
Week 1–2
Shop drawings and landlord approval
Detailed drawings with sections and mounting. We submit to your landlord or architect and handle revisions.
Weeks 2–6
Permit
Submitted the same week you sign. We track it weekly and answer reviewer comments the day they arrive.
Weeks 4–8
Fabrication
Aluminum returns, acrylic faces, UL-listed LED modules and power supplies. Every piece is inspected before it leaves the shop.
Install day
Install and switch-on
Our crew installs, a licensed electrical contractor makes the final connection, and we test the sign lit. Closeout photos the same day.
After
Warranty and service
1-year labor and 5-year LED warranty in writing. Maintenance plans available for property managers.
Start with a photo and an address
Got a wall that needs a sign?
Send the address and a photo of the building. We will come back with a scaled mockup, a price and a realistic permit-to-install date.
01
We review your project the same day
02
Site survey and mockup
03
Itemized quote with dates