Skip to content
Illuminated multi-tenant pylon sign at a suburban retail center at dusk

Multi-tenant · Pole · Highway visibility

Pylon signs for the GA-400 and I-85 corridors.

Tall, engineered site signs for shopping centers, auto dealers, fuel stations and hotels that need to be seen at speed.

  • 1-yr / 5-yr · Labor / LED warranty in writing
  • Same week · Permit submitted after signing
  • UL-listed · Illuminated components
  • COI same day · GL, auto and workers’ comp

Quote your pylon signs

Two quick steps. Photos help but aren’t required.

Step 1 of 2
What do you need?
Sign type (pick any)

No obligation. We reply within one business day.

Pylon & Site Signs

What you get

Pylons are structural projects. They need wind-load engineering, a foundation design and a permit set that most counties review closely. We bring the engineering, the drawings and the crane.

For existing pylons we reface, re-light with LED and replace tenant panels without disturbing the structure.

What it costs

Pylons are engineered per site. Refaces and LED retrofits are often a fraction of a new structure; ask us to quote both.

Options we build

Multi-tenant pylons

Center ID plus tenant panels, built so panels swap in an afternoon.

Single-tenant pole signs

Fuel, auto, hotel and restaurant pole signs.

Pylon covers and refaces

New shroud and faces over an existing pole.

LED retrofits

Swap fluorescent tubes for LED to cut power and service calls.

Directional and site signs

Entrance, wayfinding and parking signs to match.

Removal

Safe takedown and disposal of old structures.

Examples of this work

All examples
Multi-tenant pylon Example

Retail

Multi-tenant pylon

Halo-lit letters, medical office Example

Medical

Halo-lit letters, medical office

Front-lit storefront letters Example

Retail

Front-lit storefront letters

From survey to switch-on

One crew. Four steps.
No handoffs.

You deal with one accountable team from the first measurement to the night the letters light up.

  1. 01

    Survey

    We measure the wall or site, locate power, photograph everything and review landlord criteria.

  2. 02

    Drawings & permit

    Shop drawings for your approval, then the permit is submitted the same week you sign.

  3. 03

    Fabricate

    Letters and cabinets built with UL-listed components, inspected before they leave the shop.

  4. 04

    Install & switch on

    Our crew installs, a licensed electrician connects, and you get photos the same day.

Straight answers

Questions we hear every week

Don’t see yours? Call (678) 000-0000 and talk to the shop.

How long does a new sign take?

Plan on 4 to 8 weeks for channel letters from signing to switch-on. Permits usually take 2 to 6 weeks depending on the county or city, and fabrication 2 to 4 weeks. We submit the permit the same week you sign so the clock starts right away.

Do you handle the sign permit?

Yes. We survey the site, prepare the drawings, submit the permit and answer reviewer comments. Permit fees and engineered drawings are listed as separate lines on your quote.

What does a channel letter sign cost?

Most illuminated channel letter sets land between $3,000 and $20,000 installed. A common reference point is 24-inch letters at roughly $400 to $750 each installed. Your quote is built from the actual letter count, size, lighting and wall.

Do you install signs made by another company?

Yes. Install-only work is a large part of what we do, especially for national sign companies. Ship the sign to us or to the site and we handle staging, install, electrical connection and closeout photos.

What warranty do you offer?

A 1-year labor warranty and a 5-year warranty on LED components, in writing with every job.

What do you need from me to quote?

A photo of the building or wall, the address, your logo file if you have one, and your landlord’s sign criteria if you lease. A rough size and deadline helps too.

Start with a photo and an address

Got a wall that needs a sign?

Send the address and a photo of the building. We will come back with a scaled mockup, a price and a realistic permit-to-install date.

01

We review your project the same day

02

Site survey and mockup

03

Itemized quote with dates

(678) 000-0000

Request your quote

We reply within one business day.

Step 1 of 2
What do you need?
Sign type (pick any)

No obligation. We reply within one business day.

Call Free Quote